Bathtub Install

 
 

HOORAY! We got the tub and washer-dryer into place! This build is centered around the element of WATER, so naturally I was elated to see these two appliances go in. My father has worked for NV Energy for several decades. In one of his positions as a lab tech he managed and treated samples of water that facilitated the steam turbines at the Reed Gardner plant. I am so thankful for his water and organic chemistry knowledge! When the wagon is complete we will be able to pull water from any natural source and clean it for use AND for consumption, thanks to the mighty pump and several-stage Carbon and R/O filtration system we have installed. The fresh (and grey) tanks will hold almost 100 gallons of water for use! With the sub-wall, flooring, and appliances now in place, the bathroom is really coming together. I can fully visualize having a soak and watching the birds and trees through the window. Ahhhhhh.

 
Previous
Previous

Finished wall samples

Next
Next

Upper Cab Reframe