Rear Wall Fabrication

 
 

We were able to remove the window to do some reframing and plumbing around the back wall area. It started to finally feel like a real room when the plywood sub wall went up. We can now visualize where the tub will be after installing the valve, and the shower is also plumbed and ready. We routed the floor in the corner for the toilet and drilled the brackets that will hold it in place, and installed that too. It will be vented to the outside and we also have a fan to install above the bathroom as well.

 
Previous
Previous

Plumbing and Water Heater

Next
Next

Battery Housing Installation