Weirdo Wagon
Rear floor Fabrication
Welding in floor and corner supports, and the beginning of sub-wall and interior fabrication on the back wall. Finally, some interior fab!
Kitchen Sink & Counter removal
Getting into demolition and removing the kitchen counter and sink.
Captain’s chair and Dinette Removal
The very first demolition step: removal of the captain’s chair and flimsy old dinette!
Appliances pre-installation
Take a look at the washer-dryer, refrigerator, sink, tub, and toilet pre-installation.
Solar Array pre-installation
Here are the main components to the solar array system:
Six 300w KiloVault Lithium Batteries
Eight Panels
Outback FlexMax Charge Controller
Project Weirdo Wagon Begins!
Project Weirdo Wagon: a symbolic and literal representation of ancestral healing!